Kuwait Court of Cassation principle number 2242
State of Kuwait · Civil Matters — Volume 10 · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
Inferring the existence or absence of fault on the part of the employer, or the principal contractor in his capacity as employer, which excludes the contractor's liability for delay in performance. Within the authority of the court of merits. The condition thereof.
Arabic original
استخلاص توافر خطأ رب العمل أو المقاول الأصلى بوصفه رب عمل الذي تندفع به مسئولية المقاول عن التأخير في التنفيذ أو نفيه. من سلطة محكمة الموضوع. شرط ذلك.Original Arabic judgment citations
(الطعن ٣٠٦/٩٥ تجاري جلسة ١٠/٣/١٩٩٧ مج القسم الرابع - المجلد الخامس ص ٣٨١)
Source: Court of Cassation legal principles collection — Civil Matters — Volume 10 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 418. PDF pages: 418.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- ملكية السفن الصغيرة تنتقل من البائع للمشتري بمجرد العقد. ولا تتوقف على تسجيل العقد. - تسجيل السفن الصغيرة لا ي…
- تحديد موعد معين لإعذار المدين بتنفيذ التزامه عيناً أو بطريق التعويض العيني أو النقدي. م ٣٩٨ من قانون التجارة. …
- العقد الملزم للجانبين. مجال الارتباط فيما بين الالتزامات المتقابلة فيه. أن يكون التنفيذ من جهة مقابلاً للتنفيذ…
- وجوب تنفيذ العقد طبقاً لما اشتمل عليه وبما يتفق وحسن النية. حق الملتزم في الامتناع عن الوفاء ما دام الدائن لم …
- التنفيذ العيني هو الأصل. لا يعار إلى عوضه إلا إذا استحال التعويض عيناً. استخلاص الاستحالة. واقع يستقل به قاضي …
- ارتباط تنفيذ الالتزامات المتقابلة على وجه التبادل والقصاص. أثر ذلك. للمتعاقد أن يدفع بعدم تنفيذ التزامه إذا قص…