Assessing a contracting party’s breach of obligation giving rise to contractual liability, determining the facts of the action, and assessing evidence and experts’ work. Within the authority of the court of merits. It is not bound by the expert’s opinion and may adopt it when satisfied with it or reject it in whole or in part. The reason for this. - Treating an event as force majeure relieving the debtor of liability. Its condition. That it be impossible to foresee and impossible to avert. - Assessing evidence of the existence of force majeure. A matter of fact. - 420 - Obligation
Arabic original
تقدير إخلال المتعاقد بالتزامه الموجب لمسئوليته العقدية وتحصيل فهم الواقع في الدعوى وتقدير الأدلة وأعمال الخبراء. من سلطة محكمة الموضوع. عدم تقيدها برأي الخبير فلها أن تأخذ به متى اطمأنت إليه أو تطرحه كله أو بعضه. علة ذلك. - اعتبار الحادث قوة قاهرة ترتفع به مسئولية المدين. شرطه. أن يكون من غير الممكن توقعه ومن المستحيل دفعه. - تقدير الدليل على توافر القوة القاهرة. موضوعي. - ٤٢٠ - التزام
Original Arabic judgment citations

(الطعن ١٤٥/٢٠٠٢ تجاري جلسة ٢٤/٥/٢٠٠٣ مج القسم الخامس - المجلد الثامن ص ٥٣١)

Source: Court of Cassation legal principles collection — Civil Matters — Volume 10 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 420. PDF pages: 420.

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Related principles

Continue your case in the legal workspace

Open legal workspace