Kuwait Court of Cassation principle number 2154
State of Kuwait · Civil Matters — Volume 11 · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
The provisions established by the legislature for the contractor's and engineer's warranty for buildings or fixed structures they erect. Their relation to public policy. The effect thereof. It is impermissible to agree to contravene them by exemption from this warranty or limitation thereof. - The engineer's and contractor's warranty. It arises if its cause occurs within ten years from the date of completion of construction. This period is for testing the solidity of the structures and is not a limitation period. - Limitation of the warranty action. Three years beginning to run from the time the defect is discovered or the collapse occurs. - Determining the event from which limitation begins, affirmatively or negatively. A question of fact for the trial court. Its condition. Limitation of actions under a contract-agency agreement:
Arabic original
الأحكام التي وضعها المشرع لضمان المقاول والمهندس لما يقيمان من مبانٍ أو منشآت ثابتة. تعلقها بالنظام العام. أثر ذلك. عدم جواز الاتفاق على مخالفتها بالإعفاء من هذا الضمان أو الحد منه. - ضمان المهندس والمقاول. تحققه إذا حدث سببه خلال عشر سنوات من تاريخ إتمام البناء. هذه المدة لاختبار صلابة المنشآت وليست مدة تقادم. - تقادم دعوى الضمان. ثلاث سنوات تبدأ في السريان من وقت انكشاف العيب أو حدوث التهدم. - استخلاص الواقعة التي يبدأ بها التقادم إثباتاً أو نفياً. واقع لمحكمة الموضوع. شرطه. تقادم دعاوى عقد وكالة العقود:Original Arabic judgment citations
(الطعنان ٤١، ٤٤/٢٠٠١ تجاري جلسة ١٩/١/٢٠٠٣ مج القسم الخامس - المجلد الرابع ص ٦٣٧)
Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 416. PDF pages: 416.