The contractor is obliged to perform the work in accordance with the terms of the contract for works. Whether or not the contractor completed the work in this manner is a material fact. It may be proved by all means of proof, including testimony and presumptions.
Arabic original
المقاول ملزم بتنفيذ العمل طبقاً لشروط عقد المقاولة. قيام أو عدم قيام المقاول بإنجاز العمل على هذا النحو واقعة مادية. يجوز إثباتها بكافة طرق الإثبات ومنها البينة والقرائن.Original Arabic judgment citations
(الطعن ٣٢٥/٨٨ تجاري جلسة ١٨/٦/١٩٨٩ مج القسم الثاني - المجلد الثالث ص ٨١٦)
Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. PDF pages: 682.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- التزام المستأجر ببذل عناية الشخص العادي في استعمال المأجور والمحافظة عليه ورده بالحالة التي تسلمه عليها إلا ما…
- فرض الإدارة على مقاول الأشغال العامة إختيار مواد معينة. أثره.…
- حق المتعاقد في الامتناع عن الوفاء بالتزامه إذا لم يقم المتعاقد الآخر بالوفاء بما التزم به. قاعدة عامة تطبق على…
- تأخر المقاول في تنفيذ العقد لا يدل بذاته على تحمله غرامة تأخير.…
- رجوع مقاول الباطن على رب العمل. شرطه. أن يكون رب العمل مديناً للمقاول الأصلي.…
- توافر خطأ رب العمل الذي تندفع به مسئولية المقاول أو نفيه. واقع تستقل محكمة الموضوع بتقديره متى أقامت قضاءها عل…