Kuwait Court of Cassation principle number 563
State of Kuwait · Pleadings — Part Two · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
Failure by one contracting party in contracts binding on both parties to perform his obligation when it falls due permits the other contracting party, after giving him formal notice, to ask the judge to rescind the contract. Bringing an action seeking rescission. Is considered to include formal notice to the defendant. Example.
Arabic original
عدم وفاء أحد المتعاقدين في العقود الملزمة للجانبين لالتزامه عند حلول أجله يجيز للمتعاقد الآخر بعد إعذاره أن يطلب من القاضي فسخ العقد. رفع دعوى بطلب الفسخ. اعتباره متضمناً إعذار المدعى عليه. مثال.Original Arabic judgment citations
(الطعن ٦٠٧/١٩٩٩ تجاري جلسة ١/٥/٢٠٠٠ مج القسم الرابع المجلد الثاني ص١٨٨)
Source: Court of Cassation legal principles collection — Pleadings — Part Two — Ministry of Justice — Court of Cassation — Technical Office. Printed page 114. PDF pages: 111.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- الرسوم المقدرة على الأرض الفضاء بالقانون ٥٠ لسنة ١٩٩٤. جواز التظلم منها لدى وزارة المالية بالشروط التي حددتها …
- اعذار المدين بتنفيذ التزامه. غير متعلق بالنظام العام. مؤدى ذلك. جواز الاتفاق صراحة أو ضمناً على الإعفاء منه أو…
- استحقاق التعويض عن عدم تنفيذ الالتزام أو التأخير في تنفيذه. شرط إعذار الدائن للمدين بوجود تنفيذ التزامه.…
- إخلال أحد المتعاقدين في العقد الملزم للجانبين بالتزامه. أثره. حق المتعاقد الآخر في طلب الفسخ القضائي. - رفع ال…
- عدم تنفيذ المدين لالتزامه. أثره. حق الدائن في الترخيص له من القضاء في تنفيذه على - ١١٢ - المرافعات نفقة المدين…
- خروج عقد الإيجار عن أحكام القانون ٣٥/١٩٧٨ .مؤداه. سريان القانون المدني بشأنه. - العقد المحدد المدة ينتهي بانته…