A subcontractor’s workers have the right to bring a direct claim against the main contractor for what is due to them from the subcontractor. The condition for this: that the main contractor owes a debt to the subcontractor.
Arabic original
لعمال المقأول من الباطن حق الادعاء المباشر قبل المقأول الأصلي بما يستحق لهم قبل المقأول من الباطن. شرط ذلك: أن تكون ذمة المقأول الأصلي مشغولة بدين للمقأول من الباطن.Original Arabic judgment citations
(الطعن ٦١/٩٨ عمالي جلسة ١١/١/١٩٩٩ مج القسم الرابع - المجلد الخامس ص ٦١٦)
Source: Court of Cassation legal principles collection — Commercial and Labour — Volume 9 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 952. PDF pages: 952.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- الدعوى العمالية. طريقة رفعها. ضرورة أن يسبقها طلب من العامل لوزارة الشؤون الاجتماعية والعمل. الطلب هو الوسيلة …
- تقديم العامل طلباً إلى وزارة الشئون الاجتماعية والعمل هو الإجراء الوحيد لرفع الدعوى العمالية. تقديم الطلب لا ي…
- تقديم العامل الطلب إلى وزارة الشئون الاجتماعية والعمل هو الإجراء الذي تبدأ به المطالبة القضائية في الدعأوي الع…
- الطلب الذي يتقدم به العامل إلى وزارة الشئون الاجتماعية. ماهيته. الإجراء الذي تبدأ به المطالبة القضائية في الدع…
- تقديم العامل طلباً إلى وزارة الشئون الاجتماعية والعمل هو الاجراء الوحيد لرفع الدعوى العمالية. إذا أحيل النزاع …
- تقديم العامل طلباً إلى وزارة الشئون الاجتماعية والعمل هو الإجراء الوحيد لرفع الدعوى العمالية. أثر ذلك. رفعها ب…