A contracting party’s right to refrain from performing its obligation if the other contracting party does not perform what it undertook. A general rule applicable to both parties to a works contract. - 528 - Obligation - The employer’s defence that the contractor breached his obligation. Its implication is that the contractor is not entitled to remuneration. The judgment’s characterisation of this defence as a plea of statutory set-off. An error.
Arabic original
حق المتعاقد في الامتناع عن الوفاء بالتزامه إذا لم يقم المتعاقد الآخر بالوفاء بما التزم به. قاعدة عامة تطبق على طرفي عقد المقاولة. - ٥٢٨ - التزام - دفاع صاحب العمل بإخلال المقاول بالتزامه. مؤداه عدم استحقاق المقاول للأجر. تكييف الحكم لهذا الدفاع بأنه دفع بالمقاصة القانونية. خطأ.
Original Arabic judgment citations

(الطعن ٤٧/١٩٨٧ تجاري جلسة ٥/٧/١٩٨٧ مج القسم الثاني - المجلد الثالث ص ٢٩٩)

Source: Court of Cassation legal principles collection — Civil Matters — Volume 10 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 528. PDF pages: 528–529.

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Related principles

Continue your case in the legal workspace

Open legal workspace