Judicial principle — Kuwait Court of Cassation

Kuwait Court of Cassation principle number 2871

State of Kuwait · Civil Matters — Volume 10 · Ministry of Justice — Court of Cassation — Technical Office

English translation of the principle

The contractor’s obligation is an obligation to achieve a result: the building remaining sound for ten years—as a general rule—from completion of the building or construction. Article 692 Civil Code. Proof that this result was not achieved establishes breach of this obligation without any need to prove any fault. The condition therefor: the existence of a works contract under which the employer entrusted a contractor with constructing a fixed building of any kind. Contract for consideration:
Arabic original
التزام المقاول هو التزام بتحقيق نتيجة هي بقاء البناء سليماً خلال عشر سنوات -كأصل- من وقت إتمام البناء أو الإنشاء. م ٦٩٢ مدني. ثبوت عدم تحقيق تلك النتيجة يثبت به الإخلال بهذا الالتزام ودون حاجة لإثبات خطأ ما. شرط ذلك: وجود عقد مقاولة عهد فيه رب العمل إلى مقاول بتنفيذ بناية ثابتة من أي نوع. عقد المعاوضة:
Original Arabic judgment citations

(الطعنان ١٥٣٨، ١٥٤٥/٢٠٠٧ تجاري جلسة ٢١/١٢/٢٠١٠ مجلة القضاء والقانون - س ٣٨ ج ٣ ص ١٧٣)

Source: Court of Cassation legal principles collection — Civil Matters — Volume 10 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 533. PDF pages: 533.

Kuwait law articles mentioned in this principle

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Continue your case in the legal workspace

Open legal workspace