Judicial principle — Kuwait Court of Cassation

Kuwait Court of Cassation principle number 3472

State of Kuwait · Civil Matters — Volume 11 · Ministry of Justice — Court of Cassation — Technical Office

English translation of the principle

The contract must be performed in accordance with the requirements of good faith and honourable dealing. - The contractor’s obligation is an obligation to achieve a result. His failure to deliver the work in full at the time and place at which it must be delivered gives rise to contractual liability. The employer may seek specific performance or rescission, with compensation in either case if warranted. The contractor’s liability is discharged only by proving an extraneous cause. - 684 - Contract for Work
Arabic original
وجوب تنفيذ العقد وفق ما يقتضيه حسن النية وشرف التعامل. - التزام المقاول هو التزام بتحقيق غاية. عدم تسليمه العمل كاملاً في الزمان والمكان الواجب تسليمه فيها يرتب مسؤلية العقدية. لرب العمل طلب التنفيذ العيني أو الفسخ مع التعويض في الحالتين إن كان له مقتضى. مسئولية المقاول لا ترتفع إلا بإثبات السبب الأجنبي. - 684 - مقاولة
Original Arabic judgment citations

(الطعن ٩٧/٩٤ تجاري جلسة ٢٢/١١/١٩٩٤ مج القسم الثالث - المجلد الثالث ص ٩٤٧)

Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. PDF pages: 684.

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Related principles

Continue your case in the legal workspace

Open legal workspace