Kuwait Court of Cassation principle number 1638
State of Kuwait · Civil Matters — Volume 11 · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
A subcontractor’s recourse against the employer. Its condition. That the latter be indebted to the main contractor under the main contractor’s contract at the time the subcontractor brings the direct action against him. Example.
Arabic original
رجوع مقاول الباطن على صاحب العمل. شرطه. أن يكون مديناً للمقاول الأصلي بموجب عقد المقاول الأصلي وقت رفع الدعوى المباشرة عليه من مقاول الباطن . مثال.Original Arabic judgment citations
(الطعن ٥٣٢/٩٦ تجاري جلسة ١٥/٢/١٩٩٨ مج القسم الرابع - المجلد الثاني ص ٤٣٥)
Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 313. PDF pages: 313.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- كفالة الالتزام المستقبل. جائزة وإن كان الالتزام غير موجود وقت الكفالة. شرط ذلك: تحديد حد أقصى لما يلتزم به الك…
- التزام رب العمل بتسلم العمل من المقاول بعد تمامه متى وضعه تحت تصرفه. امتناعه عن ذلك دون سبب مشروع. اعتباره أنه…
- حوالة الحق. شروطها ونفاذها وأثرها عند انتقال الحق محلها. - حق المقاول الأصلي قبل رب العمل. انتقاله إلى المحال …
- التزام المقاول بإقامة بناء. التزام بتحقيق غاية. متى يبرأ منه وما لا يكفي في هذا الشأن.…
- التزام المقاول. التزام بنتيجة. ماهيتها. بقاء البناء سليماً لمدة عشر سنوات. - إثبات الإخلال بهذا الالتزام. كيفي…
- التزام المقاول هو التزام بتحقيق غاية. عدم تسليمه العمل كاملاً في الزمان والمكان الواجب تسليمه - ٣١٢ - التزام ف…