Kuwait Court of Cassation principle number 1639
State of Kuwait · Civil Matters — Volume 11 · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
The subcontractor. A party to the contract for works and a creditor who, within the limits of the remuneration owed to him by the main contractor and the accessories of that remuneration, claims from the debtor party, namely the employer, whatever is owed to the main contractor at the time the action is brought.
Arabic original
المقاول من الباطن. طرف في المقاولة ودائن يطالب في حدود الأجر المستحق له بذمة المقاول الأصلي وتوابع هذا الأجر الطرف المدين وهو رب العمل بما يكون مستحقاً للمقاول الأصلي وقت رفع الدعوى.Original Arabic judgment citations
(الطعن ٥٣٢/٩٦ تجاري جلسة ١٥/٢/١٩٩٨ مج القسم الرابع - المجلد الثاني ص ٤٣٦)
Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 313. PDF pages: 313.
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- كفالة الالتزام المستقبل. جائزة وإن كان الالتزام غير موجود وقت الكفالة. شرط ذلك: تحديد حد أقصى لما يلتزم به الك…
- التزام رب العمل بتسلم العمل من المقاول بعد تمامه متى وضعه تحت تصرفه. امتناعه عن ذلك دون سبب مشروع. اعتباره أنه…
- حوالة الحق. شروطها ونفاذها وأثرها عند انتقال الحق محلها. - حق المقاول الأصلي قبل رب العمل. انتقاله إلى المحال …
- التزام المقاول بإقامة بناء. التزام بتحقيق غاية. متى يبرأ منه وما لا يكفي في هذا الشأن.…
- التزام المقاول. التزام بنتيجة. ماهيتها. بقاء البناء سليماً لمدة عشر سنوات. - إثبات الإخلال بهذا الالتزام. كيفي…
- التزام المقاول هو التزام بتحقيق غاية. عدم تسليمه العمل كاملاً في الزمان والمكان الواجب تسليمه - ٣١٢ - التزام ف…