Judicial principle — Kuwait Court of Cassation

Kuwait Court of Cassation principle number 3465

State of Kuwait · Civil Matters — Volume 11 · Ministry of Justice — Court of Cassation — Technical Office

English translation of the principle

The rule is that no direct relationship exists between the employer and the subcontractor. The latter may claim from him what he owes the main contractor by an indirect action. The exception. - The direct action and preferential right over sums due to the main contractor. Their effect. From the date it is brought, the employer is prohibited from paying the main contractor. - Transfer of the main contractor's right against the employer to the assignee takes place encumbered by the preferential right prescribed by law for the subcontractor whenever the assignment occurs after conclusion of the subcontract.
Arabic original
الأصل عدم قيام علاقة مباشرة بين رب العمل والمقاول من الباطن. للأخير مطالبته بما هو مستحق في ذمته للمقاول الأصلي بالدعوى غير المباشرة. الاستثناء. - الدعوى المباشرة وحق الامتياز على المبالغ المستحقة للمقاول الأصلي. أثرها. يمتنع على رب العمل من تاريخ رفعها الوفاء للمقاول الأصلي. - انتقال حق المقاول الأصلي قبل رب العمل إلى المحال له يتم مثقلاً بالامتياز المقرر قانوناً للمقاول من الباطن متى تمت الحوالة في تاريخ لاحق لإبرام عقد المقاولة من الباطن.
Original Arabic judgment citations

(الطعن ٣١٤/٩٠ تجاري جلسة ١١/٥/١٩٩٢ مج القسم الثالث - المجلد الثالث ص ٩٤٣)

Source: Court of Cassation legal principles collection — Civil Matters — Volume 11 — Ministry of Justice — Court of Cassation — Technical Office. PDF pages: 683.

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Related principles

Continue your case in the legal workspace

Open legal workspace