Kuwait Court of Cassation principle number 2628
State of Kuwait · Commercial and Labour — Volume 9 · Ministry of Justice — Court of Cassation — Technical Office
English translation of the principle
The contractor's obligation is an obligation to achieve a result, namely that the building remain sound for ten years after its delivery. Article 692 Civil Code. Breach of this obligation is established merely by proving that this result was not achieved. The condition thereof. The existence of a contract for works to construct a permanent building. - A contract for works may be concluded with several contractors, each being bound by the warranty within the limits of their remit. The engineer entrusted with preparing the designs and drawings necessary for erecting the structures is also bound by the warranty. - The papers contain no contract for works between the appellant and the respondent company to build on the plot in dispute, nor did the appellant allege its existence. The challenged judgment's conclusion that Article 692 of the Civil Code does not apply. Correct.
Arabic original
التزام المقاول هو التزام بتحقيق نتيجة هي بقاء البناء سليماً خلال عشر سنوات بعد تسليمه. م ٦٩٢ مدني. الإخلال بهذا الالتزام يثبت بمجرد إثبات عدم تحقق تلك النتيجة. شرط ذلك. وجود عقد مقاولة لتنفيذ بناية ثابتة. - جواز إبرام عقد المقاولة مع عدة مقاولين ويكون كل منهم ملتزماً بالضمان في حدود اختصاصه. كما يلتزم بالضمان المهندس الذي يعهد إليه بوضع التصميمات والرسومات اللازمة لإقامة المنشآت. - خلو الأوراق من وجود عقد مقاولة بين الطاعن والشركة المطعون ضدها لبناء القسيمة محل النزاع ولم يدع بوجوده. انتهاء الحكم المطعون فيه إلى عدم انطباق أحكام المادة ٦٩٢ مدني. صحيح.Original Arabic judgment citations
( الطعن ٨٧٦/٢٠٠٥ تجاري جلسة ١٥/١٠/٢٠٠٦ مج القسم الخامس - المجلد الثامن ص ٦٧٠)
Source: Court of Cassation legal principles collection — Commercial and Labour — Volume 9 — Ministry of Justice — Court of Cassation — Technical Office. Printed page 451. PDF pages: 451.
Kuwait law articles mentioned in this principle
Ask the assistant about this principle
Guidance based on the principle and its source details, separate from the original collection text.
Related principles
- مدة سريان المناقصة التي تحددها لجنة المناقصات المركزية. مقررة لصالح مقدم العطاء. - ٤٤٨ - تجاري - عقد المقاولة:…
- ارتفاع تكاليف العمل أو انخفاضها. لا أثر لها في مدى الالتزامات التي يرتبها عقد المقاولة. لا يجوز للمقاول عند ار…
- تنفيذ المقاول لالتزامه على وجه معيب أو مخالف للعقد.أثره. حق صاحب العمل بعد إنذاره أن يفسخ العقد أو أن يؤذن من …
- الدعوى المباشرة وحق الامتياز المقرر بين مقاول الباطن تجاه المقاول الأصلي. حدودهما: ما يكون للمقاول الأصلي لدى …
- مسئولية المقاول في إنجاز العمل خلال المدة المتفق عليها متى لا تكون لها محل. - استخلاص خطأ رب العمل الذي تندفع …
- الدعوى المباشرة لمقاول الباطن قبل رب العمل للمطالبة بما يكون له قبل المقاول الأصلي. حدودها. - سداد رب العمل ال…