Arabic source examples:

State of Kuwait · Statutory text

Article 898 of Civil Code

English translation

The pre-emptor must bring the pre-emption action against both the seller and the purchaser within thirty days from the date of notification of his wish, after depositing with the treasury of the Enforcement Department the entire actual price at which the sale took place; otherwise, his right shall lapse.
Arabic original
يجب على الشفيع أن يرفع الدعوى بالشفعة على كل من البائع والمشتري خلال ثلاثين يوما من تاريخ إعلان رغبته، وذلك بعد أن يودع خزانة إدارة التنفيذ كل الثمن الحقيقي الذي حصل به البيع، وإلا سقط حقه.

Ask about this article

Guidance based on this article and the Kuwait legal sources available on this platform, separate from the original text.

Continue your case in the legal workspace

Open legal workspace