The general rule is the absence of a direct relationship between the employer and the subcontractor. The latter may claim from the employer, by an indirect action, what the employer owes the main contractor. The exception. He has against the employer a direct action and a preferential right over the sums due to the main contractor. Its effect. From the date it is brought, the employer is precluded from paying the main contractor. - The transfer to the assignee of the main contractor's right against the employer takes place encumbered with the preferential right prescribed by law for the subcontractor, where the assignment occurs on a date subsequent to conclusion of the subcontract.
Arabic original
الأصل عدم قيام علاقة مباشرة بين رب العمل والمقاول من الباطن. للأخير مطالبة رب العمل بما هو مستحق في ذمته للمقاول الأصلي بالدعوى غير المباشرة. الاستثناء. له قبله دعوى مباشرة وحق امتياز على المبالغ المستحقة للمقاول الأصلي. أثرها. يمتنع على رب العمل من تاريخ رفعها الوفاء للمقاول الأصلي. - انتقال حق المقاول الأصلي قبل رب العمل إلى المحال له يتم مثقلاً بالامتياز المقرر قانوناً للمقاول من الباطن. متى تمت الحوالة في تاريخ لاحق لإبرام عقد المقاولة من الباطن.
Original Arabic judgment citations

(الطعن ٣١٤/١٩٩٠ تجاري جلسة ١١/٥/١٩٩٢ مج القسم الثالث المجلد الأول ص٩٢١)

Source: Court of Cassation legal principles collection — Pleadings — Part Two — Ministry of Justice — Court of Cassation — Technical Office. Printed page 449. PDF pages: 446.

Ask the assistant about this principle

Guidance based on the principle and its source details, separate from the original collection text.

Related principles

Continue your case in the legal workspace

Open legal workspace